What is the relationship between the QCM and QA oversight?

Explanation:
The relationship hinges on what QC and QA each ensure on a project. The QCM is the on-site leader for quality control, responsible for carrying out the checks required by plans and specifications—inspecting work, performing or witnessing tests, recording results, and ensuring any nonconformances are corrected. QA provides independent verification and acceptance decisions, reviewing the QC process and its records to confirm that procedures were followed correctly, equipment was calibrated, and the final product meets contract requirements before it is accepted. This separation keeps the process objective: QA doesn’t perform the construction work, but instead verifies and approves it based on the QC activities. Safety training and procurement duties aren’t the primary focus of this relationship, and QA doesn’t perform all construction work itself.

The relationship hinges on what QC and QA each ensure on a project. The QCM is the on-site leader for quality control, responsible for carrying out the checks required by plans and specifications—inspecting work, performing or witnessing tests, recording results, and ensuring any nonconformances are corrected. QA provides independent verification and acceptance decisions, reviewing the QC process and its records to confirm that procedures were followed correctly, equipment was calibrated, and the final product meets contract requirements before it is accepted. This separation keeps the process objective: QA doesn’t perform the construction work, but instead verifies and approves it based on the QC activities.

Safety training and procurement duties aren’t the primary focus of this relationship, and QA doesn’t perform all construction work itself.